Home » Manufacturing

Miamed Water Treatment Plant


  1. The first phase of the process of manufacturing intravenous infusion solutions starts at Miamed from the first water treatment plant in the region, which was created from the very first moment on the latest international standards and specifications conforming to the requirements of the World Health Organization and the conditions of Good Manufacturing Practices (GMP).
  2. A unique stainless steel and heat sterilizing plant.
  3. ASME pipe system, installed and documented by an American Society for Mechanical Engineering team that complies with Good Manufacturing Practice.
  4. Water distillation process undergoes six stages of treatment before becoming injectable.
Copyright © 2024 miamed for pharmaceutical industry
Powered by Ten-neT.biz Web Development Company